Solar Panels for Schools: Funding Routes, Planning and Installation
Schools use most of their electricity in daylight, which suits solar. Here is how the funding routes work, who needs to approve a project, and how installation fits around the school year.
By
Solar Panels London
·
Last reviewed
Schools are among the best buildings for solar panels. They use most of their electricity during daylight hours, often have large flat or low-pitched roofs, and are generally occupied for decades. A school can fund solar itself, use a power purchase agreement (PPA) so a funder pays for the system, or, in some cases, receive it through the government’s school solar programme. Whichever route is used, the project needs the right approvals from whoever owns the building, and installation is normally planned around holidays.
This guide covers the funding routes, approvals, planning and installation. For our wider approach to education sites, see our solar for schools page.
Key points
School electricity use matches daylight hours well, so most of the solar generated can be used on site.
The government’s Great British Energy solar programme for schools and colleges is expanding, but places are limited and depend on the scheme’s criteria.
Schools can also buy a system outright or use a PPA with no upfront cost.
Academies, maintained schools, faith schools and independent schools have different decision makers, so check who must approve the project.
Roof work on school buildings is planned around holidays and site safeguarding rules.
Systems can be linked to monitoring displays and used in teaching.
Why schools suit solar
Most school electricity is used between about 8am and 5pm on weekdays, for lighting, IT, kitchens, heating pumps and ventilation. That is when solar generates. The more of the generation a building uses itself, the more valuable the system is, so schools tend to get good value from each panel.
The main gap is the summer holiday, when generation is highest and the building is quieter. Some schools reduce that gap with holiday clubs or lettings, export the surplus, or add a battery. Our commercial battery storage page explains when a battery helps.
Funding route 1: the government school solar programme
In 2025 the government announced that Great British Energy would fund solar panels for schools and other public buildings. In July 2026 it said that 245 schools and colleges already had funded solar, with more joining, and that a pilot would offer solar to around 150 schools and colleges in Yorkshire and the Humber, the East Midlands and the South East through PPAs at no upfront cost, with a national rollout planned for 2027 to 2028.
Places are allocated through the scheme rather than by application to an installer, and the criteria and regions can change. If your school is interested, ask your local authority or academy trust whether you are included, and check the current GOV.UK guidance. A school that isn’t in the programme can still use the routes below.
Funding route 2: buying the system
A school or trust can buy and own the system, keeping all the savings. Funding usually comes from capital budgets or trust reserves, and public sector energy efficiency funding is sometimes available, so check what is currently open to your school. The school is then responsible for maintenance, usually through a planned maintenance contract.
Funding route 3: a power purchase agreement
Under a PPA, a funder pays for, owns and maintains the system. The school pays for the solar electricity it uses at a fixed rate agreed in the PPA proposal before installation. We offer PPAs through a funding partner. The funder will want the agreement to fit the school’s tenure and will check that the right body is signing it.
Request a commercial solar assessment
Tell us about your premises and we’ll call you back to talk through solar and battery storage for your site.
We install across London and up to around 50 miles out.
Who needs to approve it?
Who owns and controls a school building varies, and the right approvals need to be in place before work starts.
Academies. The academy trust is usually responsible for the buildings, though the land may be held on a long lease from the local authority. The trust board normally approves the project.
Maintained community schools. The local authority usually owns the building and needs to approve the work.
Voluntary aided and faith schools. The diocese or foundation trustees often own the building, alongside the governing body.
Independent schools. Usually the school’s governors or proprietor.
For a PPA, the body that signs must have the authority to grant roof access for the full term. Getting this clear early avoids delays at contract stage.
Planning and building checks
Rooftop solar on many non-domestic buildings, including schools, is permitted development, provided it meets set limits. Listed buildings, buildings in conservation areas and other protected locations have extra restrictions, and older school buildings in London are often in one of these categories. We check the position for your site during the assessment.
Older school buildings also need checking for:
Asbestos. Many schools built before 2000 contain asbestos. The school’s asbestos register should be checked before any roof work.
Roof condition and structure. Flat roofs on post-war school buildings may be near the end of their life, and the structure must be able to take the extra load. Our guide to solar on warehouse and industrial roofs explains the structural and fragile roof checks, which apply to schools too.
Grid connection. Larger school systems will usually need a G99 application. See our guide to commercial solar and G99.
Installation around the school year

Roof work is usually scheduled for the summer holiday or other breaks, with scaffold and site compounds kept away from pupils. Where work must happen in term time, the school and installer agree exclusion zones, access routes and delivery times in advance. The final connection normally needs a short planned power off, which is booked for a time that suits the school.
Schools will set their own site rules on safeguarding, signing in and supervision, and installers should expect to follow them. Under the Construction (Design and Management) Regulations, the school or trust also has duties as the client, which your installer can explain at the start of the project.
Using solar in teaching

Most systems come with online monitoring, and generation data can be shown on a display in reception or used in science and geography lessons. If you would like this, mention it at the assessment so the monitoring is set up with a suitable view.
FAQs
Can our school get free solar panels?
Some schools receive solar through the government programme, and a PPA means no upfront cost, but the school pays for the electricity it uses under the agreement. Buying the system means paying upfront and keeping all the savings.
When is the best time to install?
The summer holiday is usually best for roof work, so planning should start well before, allowing time for the survey, approvals and any grid application.
Who maintains the system?
Under a PPA, the funder maintains it for the term. If the school owns the system, a planned maintenance contract is the usual approach. See our commercial solar maintenance page.
What do you need from us for an assessment?
The site address, who owns the building, recent electricity data or bills, roof drawings if available and the asbestos register. Our commercial solar assessment page explains the process.
Request a commercial solar assessment
Tell us about your premises and we’ll call you back to talk through solar and battery storage for your site.
We install across London and up to around 50 miles out.
Latest Articles
Ready to Start Saving with Solar?
Get your free no-obligation quote today. Our experts will design the perfect system for your home.
Free Home Survey
MCS Certified
Reply in 1 Working Day
Quick Links
Services
Contact
© 2026 Solar Panels London. All rights reserved.
SOLAR PANELS LONDON (SPL) LIMITED, registered in England and Wales, company number 14360308. Registered Office, 20 Rosslyn Crescent, Luton, LU3 2AU. SOLAR PANELS LONDON (SPL) LIMITED is an Introducer Appointed Representative of Shermin Finance Limited, FRN 727594, company number 01276121. Registered Office, Homeserve, Cable Drive, Walsall, WS2 7BN. Shermin Finance Limited act as a credit broker and is not a lender. Credit is subject to status and affordability.