Battery Retrofits and Solar System Upgrades in London
Already have solar panels? We add batteries to existing systems, replace old and failing inverters, and bring older Feed-in Tariff systems up to date, without throwing away the parts that still have years of life left.
Solar Panels London upgrades systems across London and around 50 miles beyond, including systems we did not install. We start by finding out what your system is actually doing, then recommend the upgrade that makes sense for your usage, your roof and your Feed-in Tariff, if you have one.

Who this is for
You export a lot and buy it back in the evening
A battery stores the solar you would otherwise export during the day and uses it when you get home. Our guide to whether solar batteries are worth it sets out what to weigh up.
Your system is 10 to 15 years old
Panels from the Feed-in Tariff years usually have plenty of life left. The inverter is the part that wears out first. Our guide to upgrading an older system explains what to keep and what to replace.
Your inverter has failed or isn't supported
If the inverter has to come off anyway, it is the natural moment to fit a hybrid that is ready for a battery. See our page on inverter replacement.
Your battery has worn out or runs out too early
We replace failed batteries and add storage to existing ones, including batteries whose manufacturer has left the market.
Two ways to add a battery to existing solar
Keep your inverter: AC-coupled battery
A separate battery inverter is connected next to your existing system. Your panels and inverter carry on exactly as before, and the battery stores the surplus. It suits a working inverter, and on Feed-in Tariff systems the generation meter is normally left as it is.
Replace your inverter: hybrid upgrade
A hybrid inverter replaces the old one and runs your panels and the battery through a single unit, with one app for everything. It suits an inverter that is old, failing or no longer supported. On Feed-in Tariff systems it changes the metering, so we plan that with you first.
Our guide to adding a battery to existing solar panels explains both routes in more detail.

The equipment we upgrade to
For most upgrades we use Solis, FoxESS or Hanchu equipment. All three offer hybrid inverters for replacing an old inverter and equipment that can work alongside an existing one, so we can match the upgrade to your system rather than the other way round. We also install Sigenergy, Tesla and SolarEdge, and can fit other brands if you have a preference, and we tell you why we have recommended one over another. Our Solis guide, FoxESS battery guide and guide to Hanchu home batteries explain those ranges.
Your Feed-in Tariff and the network operator: handled
Feed-in Tariff
You can upgrade a Feed-in Tariff system without losing your payments, as long as it keeps meeting the scheme rules and your FIT licensee knows about the changes. Our standard practice is to leave the generation meter unaffected on AC-coupled retrofits, and to fit a bidirectional meter when we replace the inverter with a hybrid, always subject to checking your particular system.
Our guides to keeping your FIT when you upgrade and the Feed-in Tariff for solar owners cover the detail.
Network operator (DNO)
A battery counts as generation. The network operator looks at the total capacity at your property, solar and battery together. Up to 16 amps per phase, which is 3.68 kW on a single-phase supply, the work is notified after installation. Above that, the design is approved first, and export limitation can often help it fit.
We handle whichever applies. Our guide to DNOs, system size and export limits explains the thresholds.
Upgrades we carry out
- Battery retrofits to existing solar, AC-coupled or hybrid
- Inverter replacement, like-for-like or upgraded to a hybrid
- Replacing failed or worn-out home batteries
- Adding more battery storage to an existing battery
- Second solar systems on unused roof space
- EV chargers added to existing solar and battery systems
- Monitoring set up or restored, and bird-proofing at the same visit
Real job · NW10, London
Adding a third battery to an existing system
This north-west London home runs a three-phase FoxESS hybrid inverter that started with two EP12 batteries. A few weeks after the install the owner wanted more stored capacity, so we added a third battery to the same inverter, taking storage from about 23 kWh to 34.6 kWh without replacing anything already fitted.
How an upgrade works
- Survey. We check your panels, inverter, consumer unit, supply and where a battery can safely go, and look at your usage.
- Design and quotation. We recommend the route that suits your system and explain what it changes, including your FIT metering.
- Paperwork. We handle the network operator notification or application, and give you what you need for your FIT licensee.
- Installation day. We isolate the system safely, fit and commission the new equipment, and check everything is working.
- Handover. We set up the app in your name, configure charging for your tariff, and leave you the certificates and warranties.
A battery retrofit is usually ground-level work, so scaffolding isn't normally needed. If anything on the roof needs attention, we'll tell you at the survey.
Guides for existing solar owners
Upgrading and batteries
- Is your 10 to 15-year-old system worth upgrading?
- Can you add a battery to existing solar?
- Adding more battery storage
- Replacing a failed home battery
- Two solar systems on one house
- Hanchu home batteries
- Solis inverters and batteries
- Adding a battery to a microinverter system
- What affects the cost of a retrofit
Common questions
Can a battery be added to any solar system?
Almost any working system can take a battery, either alongside the existing inverter or through a new hybrid inverter. We check your system first so the battery isn't paired with an inverter that is about to fail.
Will adding a battery affect my Feed-in Tariff?
Not if it is designed and metered correctly and your FIT licensee is told about the work. Your FIT rate and end date don't change.
Do you upgrade systems you didn't install?
Yes. We upgrade systems whoever installed them, including where the original installer has stopped trading, and you don't need the original paperwork to book a survey.
Can a retrofitted battery keep the power on in a power cut?
Only if it is designed and wired for backup. Our guide to what keeps working in a power cut explains the options.
Is VAT charged on a battery retrofit?
Our guide to VAT on solar panels and batteries explains the current position for batteries added to existing systems.
Do you cover my area?
We cover all of London and roughly 50 miles beyond it. If you are not sure, ask.
Request a battery retrofit quotation
Tell us about your current system and we'll arrange a survey. You'll get a clear recommendation, including what it means for your Feed-in Tariff, before you commit.
Monday to Friday, 9am–5pm. Or send us your details using the form below.
Solar Panels London. Last reviewed 16 November 2026. Feed-in Tariff and grid connection rules are current at the date of review, and what any individual system needs is always subject to a survey. Illustrations are for explanation and do not show a specific installation.
Request a battery retrofit quotation
Already have solar panels? Send your details and we’ll call you to talk through adding a battery.
We install across London and up to around 50 miles out.

Rated 4.8/5 on Trustpilot
Quick Links
Services
Contact
© 2026 Solar Panels London. All rights reserved.
SOLAR PANELS LONDON (SPL) LIMITED, registered in England and Wales, company number 14360308. Registered Office, 20 Rosslyn Crescent, Luton, LU3 2AU. SOLAR PANELS LONDON (SPL) LIMITED is an Introducer Appointed Representative of Shermin Finance Limited, FRN 727594, company number 01276121. Registered Office, Homeserve, Cable Drive, Walsall, WS2 7BN. Shermin Finance Limited act as a credit broker and is not a lender. Credit is subject to status and affordability.