Rated 4.8 on Trustpilot

Read Reviews

Illustration of a house with two separate groups of solar panels on different roof slopes

·

Solar Panels

Can You Have Two Separate Solar Systems on One House?

Adding a second, separate solar system is a common way to use more roof without touching an older system. Here is how it works, and what to watch with metering and approvals.

By

Solar Panels London

·

Last reviewed

Yes. Many homes have two separate solar systems, usually because panels were added to a different roof slope years after the first installation. Each system has its own panels and inverter, and both connect to your home’s electrics. It is a common way to add generation without touching an older system that is still on the Feed-in Tariff. The things to get right are metering, export payments, and whether the combined size needs approval from your network operator.

Key points

  • A second system has its own panels and inverter, so it doesn’t change how the first system works.

  • On a Feed-in Tariff home, the new system won’t earn FIT payments, and its generation must be kept separate from the FIT meter.

  • Export from the new system can be paid under the Smart Export Guarantee if it is MCS certified and you have export metering.

  • The network operator looks at the total capacity at your property, including both systems and any battery.

  • A battery can often be added at the same time and set up to work with both systems.

Why people add a second system

  • Unused roof space. The first installer may have used only one slope, or panels were smaller then.

  • More electricity use. An electric car, a heat pump or working from home can make the original system too small. Our guide to how many solar panels you need helps you work out how much.

  • Protecting a Feed-in Tariff. Leaving the original system alone and adding a separate one avoids changing an accredited installation.

  • A different direction. A second array on an east or west roof spreads generation across the day.

Sometimes it is simpler to extend the existing system instead. Our guide to adding more solar panels to an existing system compares the two.

Illustration of two inverters on a wall, each connected to its own group of panels, feeding one consumer unit

The Feed-in Tariff

New panels added since 15 January 2016 don’t earn FIT payments, whether they extend your old system or form a separate one. What matters is that your FIT generation meter only records the original system’s output, so the new inverter must be wired so its generation isn’t counted on that meter. Tell your FIT licensee about the work. Our guides to keeping your Feed-in Tariff when you upgrade and the Feed-in Tariff for solar owners explain the rules.

Export payments

Export from the new system can be paid under the Smart Export Guarantee if it is installed by an MCS certified installer and you have export metering, usually a smart meter. If your original system is on FIT export payments, the supplier will need to understand how export is split between the two systems, so ask before you sign up.

The network operator

Network operator guidance is clear that the simpler G98 route depends on the combined capacity of all the generation at your property, including electricity storage, not each system on its own. On a normal single-phase supply, that limit is 16 amps per phase, or 3.68 kW. If your existing inverter plus the new one, plus any battery, takes you over that, the design needs approval before installation. Export limitation can often help it fit. Our guide to DNOs and export limits explains the process, and homes with a three-phase supply have a higher threshold.

Request a solar and battery quotation

Send your details and we’ll call you back to arrange a free survey.

We install across London and up to around 50 miles out.

No obligation. We’ll call you back within one working day (Mon–Fri, 9am–5pm). We only use your details to deal with your enquiry. See our privacy policy.

Adding a battery at the same time

A second system is a good moment to add storage. A hybrid inverter on the new system can run the new panels and a battery, while the old system carries on as before. Alternatively, an AC-coupled battery can store surplus from both systems. Which is better depends on your FIT metering and how much each system generates. We usually use Solis, FoxESS or Hanchu equipment for these upgrades.

Illustration of a battery added alongside two solar systems

Frequently asked questions

Can I have two inverters in one house?

Yes. Each system has its own inverter, and both connect to your consumer unit, usually on separate circuits.

Will a second system affect my Feed-in Tariff?

Not if it is wired and metered so the FIT generation meter only records the original system. Tell your licensee about the work.

Do both systems need MCS certification?

Each system is certified separately. The new one needs an MCS certificate if you want export payments for it.

Does the second system need planning permission?

Usually not for a typical house, but conservation areas, Article 4 directions and listed buildings can change that. Our planning permission guide covers the rules.

Request a solar and battery quotation. We’ll design a second system around your existing one, keep your FIT metering right and handle the network operator application.

Request a solar and battery quotation

Send your details and we’ll call you back to arrange a free survey.

We install across London and up to around 50 miles out.

No obligation. We’ll call you back within one working day (Mon–Fri, 9am–5pm). We only use your details to deal with your enquiry. See our privacy policy.

Latest Articles

Ready to Start Saving with Solar?

Get your free no-obligation quote today. Our experts will design the perfect system for your home.

Free Home Survey

MCS Certified

Reply in 1 Working Day

© 2026 Solar Panels London. All rights reserved.

SOLAR PANELS LONDON (SPL) LIMITED, registered in England and Wales, company number 14360308. Registered Office, 20 Rosslyn Crescent, Luton, LU3 2AU. SOLAR PANELS LONDON (SPL) LIMITED is an Introducer Appointed Representative of Shermin Finance Limited, FRN 727594, company number 01276121. Registered Office, Homeserve, Cable Drive, Walsall, WS2 7BN. Shermin Finance Limited act as a credit broker and is not a lender. Credit is subject to status and affordability.