Rated 4.8 on Trustpilot
Read Reviews
0% VAT on home solar and batteries ends 31 March 2027. What it means for you
Why Hammersmith and Fulham Homeowners Choose Us
Local Knowledge
We know Hammersmith and Fulham properties, from Victorian terraces to modern builds. We understand local planning and work with the Council
Ongoing Local Support
Local aftercare, servicing and maintenance for the lifetime of your system, from our team based in NW London.
Solar Solutions for Every Hammersmith and Fulham Property
Solar panels in Hammersmith and Fulham: terraces, mansion blocks and a council keen on solar
Hammersmith and Fulham is one of the most flat-dominated boroughs in the country. It has dense Victorian and Edwardian terraces from Brook Green to Parsons Green, mansion blocks across Fulham and West Kensington, and 44 conservation areas. Whether solar is simple here usually depends on two things: what kind of building you live in, and which street it is on.
Most homes here are flats
At the 2021 Census, 75% of the borough's dwellings were flats or maisonettes, one of the highest shares in England. Since 27 August 2026, blocks of flats have had permitted development rights for solar for the first time. The right belongs to the block, so the freeholder or management company makes the decision, not an individual flat owner. Mansion blocks can work well because their roofs are often large and shared. The council has already considered solar on a Fulham mansion block in a conservation area: for Quenington Mansions in 2024, officers recommended approval and judged the energy benefits to outweigh the limited heritage impact. If you own a flat, the first step is usually a conversation with your managing agent or freeholder.
44 conservation areas and what they mean for your roof
The borough's conservation areas include The Mall on the riverside, St Peter's Square, Ravenscourt and Starch Green, Brook Green, Barons Court, Parsons Green, Walham Green, Moore Park and the Gunter Estate. Under the national rules, the restriction in a conservation area or World Heritage Site applies to panels on a wall fronting a highway, not to a roof slope. Panels on a pitched roof, including a front roof slope, are normally permitted development as long as they sit no more than 0.2 m proud of the roof and below the ridge. Since 27 August 2026, a flat roof in a conservation area needs a short prior approval application to the council first.
Where the council does look at a scheme, its 2018 planning guidance asks for panels to be integrated into the building's design and placed in the least intrusive locations. Around 500 buildings in the borough are listed, and these need planning permission and listed building consent. Read more in our guide to planning permission for solar panels in London.
Article 4 directions: watch the roofing, not just the panels
The council's published list of Article 4 directions covers streets in areas such as The Mall, St Peter's Square, Ravenscourt and Starch Green, Parsons Green, Studdridge Street, Hammersmith Grove and Fulham Park Gardens. Every direction on that list was made before 2008, when householder solar rights were introduced, so none of them can have removed those rights. Some of them do control roofs, though. The Fulham Park Gardens direction covers changes to roof coverings, and the direction for The Cottages on Fulham Palace Road covers roof alterations and roof covering materials. If your roof needs replacing before panels go on, that roofing work may need permission even when the solar does not. See whether you need a new roof before solar. We check the designations and any direction for your address before we quote.
A proposed borough-wide solar order
In 2024 the council approved a draft Local Development Order for rooftop solar across the borough, along with a separate order that would allow suitable solar on listed buildings, and consulted on both in early 2025. Under the proposal, owners would submit basic details to the council instead of making a full planning application. We could not confirm from council sources whether the orders have been adopted, so we check the current position for each property.
Connecting to the grid
The whole borough is served by UK Power Networks. Most domestic systems are notified after installation. Larger systems, and many mansion block or commercial roofs, need approval before they connect. We handle the DNO paperwork as part of the installation. Our guide to DNOs and export limits explains the process.
If you live in Hammersmith, Fulham or Shepherd's Bush and want to know what your roof or block could support, request a solar and battery quotation. We will check your property's designations first.
Local planning information checked against London Borough of Hammersmith and Fulham sources on 27 October 2026. Planning designations change, so this is general guidance, not advice for a specific property.
Solar Benefits for Hammersmith and Fulham Residents
Is my home suitable for solar panels?
When we design your system we look at your roof’s orientation, pitch and condition, and any shading from trees or neighbouring buildings, using your photos and satellite imagery, then confirm it all at the survey. We’ll tell you honestly whether solar is a good fit for your home, and if it is, we’ll design the system around getting the best out of it.
How much can I save on my energy bills?
It depends on how much electricity you use, when you use it, the size and orientation of your system, and whether you add a battery to store daytime solar for the evening. Rather than quote a typical figure, we model the expected generation and savings for your home as part of your free quote, using your actual bills and roof.
How long does installation take?
We aim to get your system up and running as quickly as we can. After your survey, installation is typically scheduled within 2–8 weeks, though the exact timing depends on things like DNO approval, scaffolding, roof access and how complex the system is. We agree a date with you once those are confirmed.
Do you offer finance options?
Yes, finance may be available, subject to status. Ask us about it when you request your quote.
What does the quote cover?
Your written quotation lists everything included for your home – the panels, inverter, any battery, mounting, scaffolding where your home needs it, electrical work, DNO paperwork and MCS certification – with one total price. What’s on the quotation is what you pay, with no hidden extras.
Do you offer a guarantee?
We offer a 6-year workmanship warranty, insurance-backed through IWA, on top of the manufacturer warranties covering the panels, inverter and battery. Annual servicing, monitoring checks and fault finding are available as an aftercare service. If something isn’t right with our work, we come back and put it right.

Rated 4.8/5 on Trustpilot
Ready to Start Saving with Solar?
Get your free no-obligation quote today. Our experts will design the perfect system for your home.
Free Video Consultation
MCS Certified
Reply in 1 Working Day
Quick Links
Services
Contact
© 2026 Solar Panels London. All rights reserved.
SOLAR PANELS LONDON (SPL) LIMITED, registered in England and Wales, company number 14360308. Registered Office, 20 Rosslyn Crescent, Luton, LU3 2AU. SOLAR PANELS LONDON (SPL) LIMITED is an Introducer Appointed Representative of Shermin Finance Limited, FRN 727594, company number 01276121. Registered Office, Homeserve, Cable Drive, Walsall, WS2 7BN. Shermin Finance Limited act as a credit broker and is not a lender. Credit is subject to status and affordability.




